Bruck Project/ Josh Wynkoop
Located in the Catskills in Southeast Ny, the Bruck project is a log cabin with vaulted
ceilings. Log cabins are typically hard to heat due to their insulation "R" values
associated with the logs; log cabins with vaulted ceilings are usually even harder to
heat. Josh chose Rehau's Raupanel due to it's very high heat output with very low
heating fluid temperatures. .For more information on Raupanel and how it can make
your job more efficient, click on the link below or give us a call.
Gallery
When you work with us, you'll gain not only a world-class team but also a wealth
of industry experience. Read about some of our significant cases below.
Crete-Heat project/ Schenk Builders of NY Inc.
The job is a 6,000 sq ft Mediterranean contemporary ICF from the footing to the roof.
There is radiant in the slab as well as staple up for the main floor. In the past Chris
Schenk has used insultarp and has tied the radiant to wire mesh, however, with this
project he decided to use Crete-Heat. Read what Chris has to say about Crete-Heat,
"What a pleasure, 4,400 sq ft slab all Crete-Heat installed and 5,000' of pex tubing
done in four hours with two men. I never prepped a floor in that short of a time. On this
job, we had to be more careful with the grading, but installing the Crete-Heat was
quicker than I thought it would be, and the radiant tubing was a breeze." For more
information on Crete-heat click on the link below or give us a call.
Carroll Equipment; Elbridge NY; Installing Contractor, Holbrook Heating/ 3
Buderus GB wall mounted high efficiency gas fired boilers heating 17,600 sq ft
building for refurbishing heavy equipment